New figures show that the nuclear industry now supports 3,500 jobs in Bristol, as the sector expands to support new nuclear construction.
At Hinkley Point C, EDF are building two new nuclear reactors, the first in a new generation of nuclear power stations in Britain providing zero-carbon electricity.
The project is a joint effort by EDF Energy (which owns 66.5% of the project) and the China General Nuclear Power Group (CGN) (which owns 33.5%). Once completed, Hinkley Point C will provide low-carbon electricity for approximately 6 million homes over a 60-year period.
Browse through typical job titles and descriptions. Look out for the Hinkley Point C roles we are talent sourcing for, view the responsibilities and what knowledge and experience is needed for each role.
Free Job Matching ServiceJoin our free matchmaking service and we will match you to employers' vacancies.
Subscribe here for jobs in Hinkley Point C
Room Survey Network (RSN) SurveyorRoom Survey Network (RSN) Surveyors undertake control survey tasks both horizontally and vertically. |
Room Survey Network SurveyorRoom Survey Network Surveyors ensure all surveying activities are undertaken safely and responsibly, and in accordance with the CDM Regulations. |
Senior SurveyorsSenior Surveyors delegate responsibilities to CE’s/Works Coordination Leads and lead, manage and motivate the team through implementation of best practice. |
Welding EngineersWelding Engineers support the Welding Managers, ensuring that all Welding and Welding Related matters are delivered to the highest standards. |
Welding/Piping QC InspectorWelding/Piping QC Inspectors monitor and report compliance with quality standards and procedures. |
Wheeled Plant OperatorWheeled Plant Operators operate the Forklift, Telehandler or Agricultural tractor including attachments or towed equipment. |
Works Permit EngineersWorks Permit Engineers ensure appropriate Standard Operating Procedures are maintained across the nuclear site. |
New figures show that the nuclear industry now supports 3,500 jobs in Bristol, as the sector expands to support new nuclear construction.
The third and final liner ring has been lifted into place by giant crane, Big Carl, at Hinkley Point C’s second reactor building.
MEH is excited to announce the completion of the first electrical system at Hinkley Point C.
Hinkley Point C’s new factories in Bristol are providing evidence of the significant productivity boost from modular construction.